We provide free proposals and quotes 24/7.
Feel free to contact us via WeChat/WhatsApp: +8619914754015
Submit your inquiry, and we will provide you with a professional solution.
{{ variable.name }}
The diamond beneficiation solution designs differentiated beneficiation process according to the different characteristics of primary diamond ore and alluvial diamond ore. The primary ore adopts the "segment crushing - stage separation" process, while the alluvial ore adopts the "washing - screening - gravity jigging" process, which is complemented by specialized rougher and concentrator equipment to realize the efficient recovery of diamonds.
Primary Ore Beneficiation Process
Three-stage crushing system:
Rough crushing (jaw crusher) to -50mm
Medium crushing (cone crusher) to -20mm
Fine crushing (high pressure roller mill) to -10mm
Stage jigging separation:
After each stage of crushing, a jigger is equipped to recover dissociated diamond in time.
Jigging tailings go to the next stage of crushing/grinding.
Grinding classification:
Ball mill and cyclone closed circuit grinding (to -2mm)
Jigging after classification to recover fine-grained diamonds
Alluvial beneficiation process
Washing and screening:
Rotary scrubber to remove clay
Vibrating screen classification (+5mm/-5mm)
Jigging roughing:
Small jigger for 0-10mm particles
Medium-sized jigger for 0-30mm particles
Oleomargarine Concentration:
Vibrating oil paste concentrator sorting
Get the final diamond concentrate


| Process type | Equipment Type | Recommended equipment | Technical Parameters |
|---|---|---|---|
| Primary Ore | Crushing equipment | Jaw crusher + impact crusher | Capacity 10-200t/h |
| Primary Ore | Jigging equipment | Sawtooth wave jigger | Processing size 0-30mm |
| Primary Ore | Grinding equipment | Ball mill + cyclone group | Grinding fineness-2mm |
| Alluvial Ore | Ore washing equipment | Rotary scrubber | Capacity 20-350t/h |
| Alluvial Ore | Jigging equipment | Specialized jigger | Processing capacity 5-50t/h |
| Alluvial Ore | Selection equipment | Vibrating oil paste concentrator | Oil belt width 600-1200mm |
Processing capacity: 10-350t/h (customized according to ore type and scale)
Processing particle size: 0-30mm full grain size
Energy consumption: only 1/3 of heavy media beneficiation
Water consumption: recycling utilization rate ≥90

✅ High-efficiency recycling: segmented crushing + stage jigging ensures early and high recovery, adapting to 0.5-30mm full-grain recycling.
✅ Economical and practical: low running cost of jigger, saving investment in oil paste beneficiation equipment.
✅ Stable and reliable: simple equipment structure, low failure rate, easy operation and maintenance.
✅ Environmental protection and energy saving: no chemical additives, recycling of wash water, reusable oil paste.
✅ Strong adaptability: adapted to all kinds of diamond deposits, can flexibly adjust the process according to the characteristics of the ore.
We provide a full range of technical support:
🔬 Program design: diamond beneficiation process design, equipment selection and configuration
🛠️ Engineering services: production line plant planning, drawing design
👨💻 Production support: equipment installation and commissioning guidance, operator training
🔧 After-sales service: long-term technical support, supply of spare parts


Diamond primary ore beneficiation
Diamond Alluvial Ore Beneficiation
Diamond tailings re-election
Comprehensive utilization of diamond resources
For more information about diamond beneficiation solutions or to get a customized solution quote, please feel free to contact our professional technical team!
To find out more about our products and solutions, please fill out the form below and one of our experts will get back to you shortly.